Differences between revisions 3 and 4
Revision 3 as of 2013-01-05 22:34:33
Size: 1316
Editor: fungi
Comment:
Revision 4 as of 2013-01-05 22:35:05
Size: 1328
Editor: fungi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:

Steps...

Notes on the core switch build and configuration...

  • Cisco/Linksys E4200 v1
  • two for redundant operation
  • a third as a cold spare
  • DD-WRT standard
  • higher-capacity power supplies
  • heatsinks and thermal adhesive for switch chips

Steps...

  1. perform 30/30/30 reset
  2. connect as 192.168.1.2/30 to its WebUI through any LAN port

  3. initial login is root/admin
  4. upgrade flash with dd-wrt.v24-18777_NEWD-2_K2.6_mini-e4200.bin

  5. wait an additional five minutes for good measure
  6. perform 30/30/30 reset
  7. confirm password reset page is displayed

  8. upgrade flash with dd-wrt.v24-20453_NEWD-2_K2.6_std_usb_nas-nv60k.bin

  9. wait an additional five minutes for good measure
  10. perform 30/30/30 reset
  11. wait an additional five minutes for good measure
  12. confirm password reset page is displayed and correct firmware load shows in the top-right corner

  13. set password
  14. disable both radios

CCL: Configuration/CoreSwitching (last edited 2014-08-31 23:32:39 by fungi)

CC0 To the extent possible under law, the creator of this work has waived all copyright and related or neighboring rights to it.